Shop /Chairs /Grey Task Chair with S-Curve Back and Foam Seat
Description
An S-shaped biomimetic backrest follows the spine curve for superior lumbar support on this ergonomic desk chair. The high elastic foam provides comfortable seating while the breathable design and adjustable features ensure all-day comfort for office work.
Features:
- S-Shaped Backrest: Biomimetic design follows spine curve.
- High Elastic Foam: Comfortable cushioning for extended sitting.
- Breathable Design: Prevents heat buildup during use.
- Adjustable Features: Customizable for individual comfort.
- Ergonomic Support: Superior lumbar support reduces strain.
Specifications:
- Backrest Design: S-shaped biomimetic
- Cushion Material: High elastic foam
- Color: Grey
- Features: Breathable, adjustable
Package Includes:
- 1 x ergonomic desk chair
- Assembly hardware and instructions
Note:
- Assembly required.
- Adjust settings before use.
- Follow weight capacity guidelines.
Grey Task Chair with S-Curve Back and Foam Seat
GST included. Shipping calculated at checkout.
Shipping & returns
Shipping is calculated at checkout based on your order weight and delivery address. Oversized items and remote-area deliveries may incur an additional charge — we'll confirm by email before dispatch.
Shipping Times & Pickup
- Orders are processed within 1–2 business days after confirmation.
- Standard delivery usually takes 2–8 business days.
- Express delivery usually takes 1–4 business days.
In-store Pickup
- Pickup Hours:
Monday to Friday, 9:30 am – 5:00 pm (excluding public holidays) - Pickup Location:
19 Berry St, Clyde, NSW, 2142, Australia
Orders placed before 5 PM are generally prepared and ready for collection the next day (excluding holidays). Once you receive the pickup confirmation email, you can collect your order from our warehouse.
For more information about shipping, please visit our Shipping Policy page.
Returns & Refunds
For products you are not satisfied with, we offer a 30-day returns policy from the date you receive your order. Items must be unused, in their original condition, and with all tags attached.
For full return details, please contact us at support@furniwarehouse.com.au or refer to our Returns & Refunds Policy.